Coordinate your cabin air filter production equipment and modular workshop in one factory setup plan, from starting configuration to an expanded working area.
Coordinate filter-media handling, pleating and edge-processing workstations. The concept illustrations show two and four repeated finishing workstations respectively; agree the final PLHX-4 quantity and workstation balance against your output target.
Compare the starter and expanded concepts below. A larger workshop does not by itself establish a guaranteed increase in output.
2 modules · 6 × 6 × 3 m · 36 m² nominal footprint
4 modules · 12 × 6 × 3 m · 72 m² nominal footprint
| Configuration | Modules | L × W × H | Gross footprint |
|---|---|---|---|
| Starter | 2 modules | 6 × 6 × 3 m | 36 m² |
| Expanded | 4 modules | 12 × 6 × 3 m | 72 m² |
Nominal dimensions follow the supplied concept drawings. Gross footprint is not net usable floor area, and 3 m is not a confirmed internal clear height. Openings, connections, foundations and loads need detailed design.
Review flat-pack or folding construction alongside the cabin air filter equipment layout. Confirm floor construction, machine loads, openings and usable clearances before selecting the building system.
Building modules and equipment can be planned for joint shipment. The loading method depends on the confirmed building system and machine sizes; it does not imply that a fully installed factory travels as one unit.
| Work package | What to coordinate |
|---|---|
| Building modules | Construction system, floor loading, openings, connections and included components |
| Production equipment | Confirmed machines, quantities, dimensions, weights, tooling and packing |
| Transport | Packing list, loading arrangement, destination, shipment batches and unloading plan |
| Destination site | Foundations, access, lifting arrangements, electricity, air and process-specific services |
| Installation and startup | Assembly, utility connection, commissioning, training and agreed responsibilities |
Building modules and equipment can be organized for joint shipment under the agreed project plan. Shipping quantities, site works and startup dates are established after the layout and supply scope are confirmed.
The concept covers the illustrated equipment and work areas. Confirm supporting operations, material storage, testing, packing and utilities separately against the final process route.
Select the arrangement from the required workstations, actual machine dimensions and handling space. A larger footprint alone does not establish capacity or confirm that future expansion can be made without structural changes.
Agree a schedule covering design confirmation, supply, site preparation, transport, assembly and commissioning. No fixed startup duration is assumed from the concept images.
Send your product samples or drawings, target output, equipment list, site dimensions, destination and available utilities. Include your preferred timing and the supply scope you need.
Request my cabin air filter workshop plan →To protect the documents privacy, please contact us to get the download password: [email protected]